[Sep 21, 2021] Updates Up to 365 days On Valid MB-320 Braindumps
Best QualityMB-320 Exam Questions Microsoft Test To Gain Brilliante Result
NEW QUESTION 47
A configure-to-order company is implementing Dynamics 365 for Finance and Operations. The company is preparing to use the product configuration model functionality to develop the Bill of materials (BOM), routes and valid configuration combinations.
You need to set up the configuration models, constraints, and pricing.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 48
A company wants to account for the time to set up a machine to manufacture a new part.
You need to set up the costing calculations in the system.
Which three calculation group warnings can you set up? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. No cost price
- B. No consumption
- C. No route
- D. No BOM
- E. No resources
Answer: A,C,D
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/cost-management/bom-calculation-groups
NEW QUESTION 49
A company sells large batches of chemicals. Item specifications vary from batch to batch.
You must fulfill multiple orders from the same batch of chemicals. If a single batch cannot be reserved, manual reservation must be used. The system must also make reservations based on the earliest batch receipt date.
You need to set up a new chemical item that automatically uses the new batch reservation logic.
Which three settings should you configure? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. In the Tracking dimension group, select Coverage plan by dimension for batch number.
- B. In the Storage dimension group, select Coverage plan by dimension for the site and warehouse dimensions.
- C. In the Item model group, select FEFO date-controlled.
- D. In the Item model group, select Same batch reservation and Consolidate requirements.
- E. In the Item model group, select the FIFO inventory model.
Answer: C,D,E
NEW QUESTION 50
A company uses Lean manufacturing concepts to produce paper plates redesigned the layout of the warehouse and production floor.
The company's production flow activities no longer match the tasks of the workers Employees use paper and manual communication to complete the tasks.
You need to update the production flows to match their current processes by deactivating the obsolete production flows and creating new ones.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
NEW QUESTION 51
A company produces multiple products that require an installation kit that includes 50 components.
The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order.
You need to set up the product BOM for the finished good.
What should you do?
- A. Select Phantom on the engineering fast tab on the kit item.
- B. Change the line type to Phantom.
- C. Change the coverage group on the kit item to Manual.
- D. Change the line type to Pegged supply.
Answer: B
NEW QUESTION 52
A company uses separate finished good item numbers for size variations of the same product.
The company wants to minimize the number of variously-sized items that are created.
You need to perform the setup to allow variants in size to the product master.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
Reference:
https://gfeaxblog.wordpress.com/2017/09/28/o365-how-to-create-product-masters/
NEW QUESTION 53
You are the production scheduler at a manufacturing company. You schedule estimated production orders and ensure that capacity is used efficiently.
You have an order that must be scheduled at the resource group level and scheduled backward from the delivery date specified on the production order.
You need to schedule the order.
Which scheduling parameters should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/operation-sch
NEW QUESTION 54
You need to modify the production order defaults for the manufacturing execution production order Start process.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION 55
A process manufacturing company is implementing rebates in Dynamics 365 for Finance and Operations for some of their customers on specific items.
You are the production consultant in charge of implementing the processes needed for calculating and applying the rebates for the subset of customers and items.
You need to implement the order of transactions to process the rebates.
In which order should the actions be performed? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 56
A company uses Dynamics 365 Process manufacturing.
Employees work a half day so that they can attend a company event. You have a rush order that must be completed that same day.
After reviewing the net requirements of the batch order, only 400 of the total quantity of 1400 units must be completed today. The production manager must retain the original batch number as the quantity of 400. The original batch number must appear on documentation for the customer.
You need to split the batch order into two orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
1 - Select the batch order.
2 - Select Split
3 - Enter 1,000 in the split quantity field.
NEW QUESTION 57
A company produces homeopathic lotions for pain relief and uses Dynamics 365 for Finance and Operations.
Several components used in the production of the pain-relieving lotion and oils have special government-mandated reporting requirements.
You need to ensure the company can provide the appropriate reporting and tracking for these components.
Which parameters should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION 58
A company implements Dynamics 365 Finance and Operations.
You need to ensure that cost roll-ups and sales price calculations are configured for the scenario. Which options should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 59
A manufacturing plant uses Lean manufacturing. Operators process Kanban consumption manually by using a mobile device.
The production team must use automatic empty registration for some of the event Kanbans. Registration must occur when the last job of a Kanban is completed.
You need to update the Kanban rule to meet this requirement.
What Kanban setting should you update?
- A. Select to register as empty when handling units are received.
- B. Set a fixed Kanban quantity.
- C. Select to manually register as empty.
- D. Select to register as empty when the source requirement is registered.
Answer: D
NEW QUESTION 60
An inventory control clerk manages adjustments in inventory.
Some adjustments have a cost impact. Other adjustments must be posted to a specific ledger account or must be registered in inventory.
You need to configure the system.
Which journal types should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION 61
A company manufactures automobile engines.
You must create product configurations for values that are used in different types of engines. Each value is based on a master valve design. Different gaskets and fittings are used to allow valves to work with different engines.
You need to translate production plans into Dynamics 365 Finance and Operations elements.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 62
A company produces multiple products that require an installation kit that includes 50 components.
The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order.
You need to set up the product BOM for the finished good.
What should you do?
- A. Change the line type to Phantom.
- B. Change the coverage group on the kit item to Manual.
- C. Change the line type to Pegged supply.
- D. Select Phantom on the engineering fast tab on the kit item.
Answer: D
NEW QUESTION 63
You have updated a cost category price from $5.00 to S7.00. You process a production order which uses the cost category. After ending the order, you realize a new standard cost was not calculated after the price update.
You need to validate how this impacted the financial voucher transactions. What transaction would you see in the general ledger?
- A. $2.00 debit to the production quantity variance account
- B. $2.00 debit to the production price variance account
- C. $2.00 credit to the production price variance account
- D. $2.00 credit to the lot size variance account
Answer: C
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-analyzing-common-sources-of-productio
NEW QUESTION 64
You are the lead product design engineer at a plastics manufacturing company. You implement a new process that uses a single tool to produce three finished goods at the same time.
You need to set up the planning item number and formula to correctly to manufacture the three items.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Specify each of the finished good items as co-products
- B. Create item number for planning item and the associated formula
- C. Add a coverage group to the formula
- D. Add minimum and maximum quantities on formula
- E. Assign co-products to the formula
Answer: A,B,E
NEW QUESTION 65
You are responsible for product and formula maintenance for a paint manufacturer.
You create a formula for white paint and add its lines. When the formula size increases or an ingredient changes, the quantity of the pigment ingredient must be adjusted proportionately.
You need to set up the formula line for the pigment.
Which formula feature should you use?
- A. Pegged supply
- B. Step consumption
- C. Variable
- D. Scalable
Answer: D
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/formulas-vers
NEW QUESTION 66
A company uses Dynamics 365 for Finance and Operations for Process manufacturing.
Employees spend considerable time cleaning and setting up machines in a specific area between production orders. You must group production activities to optimize cleaning and set up time.
You need to set up the system.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.
Answer:
Explanation:
Explanation
Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/set-up-product-sequences
NEW QUESTION 67
A pharmaceutical manufacturer uses Process manufacturing.
You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 68
You are the production supervisor at a manufacturing company. You are in the process of configuring the production control module and its parameters.
A company plans to use manufacturing execution. Bill of materials (BOM) item consumption must be generated when items are reported at the operation level.
You need to configure the Manufacturing execution production order defaults form to allow for back flushing on operations.
How should you set up Automatic BOM consumption? To answer, drag the appropriate setting to the correct targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/production-parameters-manufacturing-execution
NEW QUESTION 69
A company uses Process manufacturing.
You need to review formulas and how the different ingredient types impact the batch balancing process.
Which ingredient types should you use? To answer, drag the appropriate ingredient types to the correct scenarios. Each ingredient may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/batch-balanci
NEW QUESTION 70
A company produces various products using Process manufacturing.
The manufacturer makes two co-products from a formula and rarely produces the primary formula item. The costs of making the co-products are inflated. The manufacturer must update the costs of producing the co- products and change the formula to not produce the primary formula item.
You need to change the primary formula item type.
What should you do?
- A. Change the cost of the primary formula item to zero and then recalculate the item cost
- B. Change the production type to Bill of materials and recalculate the item cost
- C. Associate the costs to produce by-products with the items
- D. Change the primary formula item to use the planning item type
Answer: D
Explanation:
Section: Create, process, and manage production batch orders
NEW QUESTION 71
A company is looking to use Dynamics 365 for Finance and Operations.
The company is in the process of redesigning and retooling an existing manufacturing plant to support a large long-running contract. They want to be able to forecast capacity to easily ramp up for additional products.
You need to set up the environment.
Which type of manufacturing should you implement?
- A. Lean
- B. Discrete
- C. Job shop
- D. Process
Answer: C
Explanation:
Section: Set up and configure manufacturing
NEW QUESTION 72
......
Focus on MB-320 All-in-One Exam Guide For Quick Preparation: https://www.realexamfree.com/MB-320-real-exam-dumps.html
Tested Material Used To MB-320: https://drive.google.com/open?id=14VAleFwl3ZiWC7LWUa5xo5wfTcibodGS

