1z0-1075-20 Free Exam Study Guide! (Updated 65 Questions) [Q31-Q53]

Share

1z0-1075-20 Free Exam Study Guide! (Updated 65 Questions)

1z0-1075-20 Dumps for Manufacturing Cloud Certified Exam Questions & Answer

NEW QUESTION 31
You want to use a predefined Standard Operation in a Work Definition, but you also want to change the usage of the Standard Operation resource. Identify the setup required.

  • A. Use the Transfer and Edit Standard Operation functionality to edit the resource usage.
  • B. Use a Resource exception for the resource and alter its usage.
  • C. Select the Referenced check box while adding the standard operation to the work definition and change the usage manually.
  • D. Deselect the Referenced check box while adding the standard operation to the work definition and change the usage manually.

Answer: C

 

NEW QUESTION 32
Identify four parameters that are considered in the calculation of manufacturing lead time in Oracle Manufacturing Cloud.

  • A. The lot size of the item
  • B. The primary work definition of the item
  • C. Resource calendars of the work centers involved
  • D. The shifts are defined in the plant calendar
  • E. Plant calendar exceptions
  • F. Resource calendar exceptions

Answer: A,B,D,F

 

NEW QUESTION 33
In a manufacturing cloud implementation, production operators want to perform work order updates using Dispatch List.
Identify two tasks that the Dispatch List allows the production users to perform.

  • A. Report Component Returns
  • B. Report Resource Transactions
  • C. Report Receipts
  • D. Report Cost Transactions
  • E. Report Material Transactions by Quantity and Serial Number

Answer: B,E

 

NEW QUESTION 34
In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an assembly have been defined as required.
A cost accountant created different scenarios to represent different manufacturing and cost assumptions and compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the cost scenario to cost accounting.
Identify three process steps that the cost accountant has to perform to transfer the assembly to cost accounting in frozen type.

  • A. Publish cost planning scenario to Accounting.
  • B. Build cost planning scenario and perform cost roll up.
  • C. Define a cost planning scenario with Material, Resource, Overhead cost plans, and work definition.
  • D. Transfer Transactions from Inventory to Costing.
  • E. Create Accounting Distributions.
  • F. Transfer transactions from production to Costing.

Answer: C,D,E

 

NEW QUESTION 35
A Manufacturing Engineer in a plant is creating an alternative manufacturing process for an item using its existing Work Definitions. After copying from the existing Work Definition WD1 to the alternative Work Definition WD2, the engineer finds that the operation items were not copied in the alternative manufacturing process WD2.
Identify the reason.

  • A. The Production Priority was not populated in the new Work Definition WD2 during creation.
  • B. The Item and Structure Name were changed in the new Work Definition WD2 during creation.
  • C. The Start Data was not populated in the new Work Definition WD2 during creation.
  • D. The Item and Structure Name in the existing Work Definition WD1 were retained in the new Work Definition WD2 as well during creation.

Answer: C

 

NEW QUESTION 36
A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift.
Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.

  • A. Review Production Transaction History
  • B. Report Resource, Material and Operation Transactions
  • C. Manage Work Orders
  • D. Review Dispatch List

Answer: C

 

NEW QUESTION 37
Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and resources available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop Integration)?

  • A. Populate Descriptive flexfields
  • B. Create and update ATO (Assemble To Order) model work definitions
  • C. Create Work Definitions
  • D. Update Work Definitions

Answer: A,B

 

NEW QUESTION 38
Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work Definition for an item that will be manufactured in-house.

  • A. Operation Items
  • B. Production Line
  • C. Operations
  • D. Resources
  • E. Manufacturing Lead Time

Answer: A,C,D

 

NEW QUESTION 39
Identify three types of Item Quantities displayed in the Work Order History tab.

  • A. Total Quantity
  • B. Scrapped Quantity
  • C. In Process Quantity
  • D. Remaining Quantity
  • E. Completed Quantity

Answer: B,D,E

 

NEW QUESTION 40
Which entity should you use to configure the manufacturing plant in Functional Manager?

  • A. Business Unit
  • B. Plant
  • C. Organization
  • D. Legal Entity

Answer: B

 

NEW QUESTION 41
A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to prevent the Work Orders from being overwritten by plan runs.
Identify the two recommendations.

  • A. Update Firm flag in the Details region of the Edit Work Definition page.
  • B. Update Supply Plan Options, Overwrite Firm Planned Orders = None.
  • C. Update Firm flag in the Details region of the Edit Work Definition Names page.
  • D. Update Firm flag in the Details region of the Edit Work Order page.

Answer: B,D

 

NEW QUESTION 42
In what three ways can you set the overcompletion tolerance for a subcomponent yield, so the job order can report the excess production completion?

  • A. Overcompletion Tolerance Type = Amount, value = 0
  • B. Overcompletion Tolerance Type = Amount, value > 0
  • C. Overcompletion Tolerance Type = Percentage, value > 0
  • D. Overcompletion Tolerance Type = Percentage, value = 0
  • E. Overcompletion Tolerance Type = Percentage, value = 100

Answer: A,C,D

 

NEW QUESTION 43
A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two hours during each of the assigned shifts.
Determine the available capacity of the resource R1 for that week.

  • A. 76 hours
  • B. 78 hours
  • C. 70 hours
  • D. 60 hours

Answer: B

 

NEW QUESTION 44
A user wants to transfer the work order status updates and resource transaction data for costed resources to Cost Management.
Which scheduled process should you run to achieve this requirement?

  • A. Transfer General Ledger Balances to Balance Cubes
  • B. Transfer Ledger Balances
  • C. Transfer Cost to Cost Management
  • D. Transfer Transactions to Costing

Answer: C

 

NEW QUESTION 45
Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.

  • A. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).
  • B. Set a local sourcing rule in GOP to determine supply creation option as Make.
  • C. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.
  • D. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.
  • E. Set the global sourcing rule in GOP to determine supply creation option as Make.

Answer: A,E

 

NEW QUESTION 46
A production Operator is executing work order in your plant. After completing move transactions, he notices that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is required to perform a reverse transaction to correct the errors. The operations are not count point enabled and not auto charged.
Identify the four transactions to correct this situation.

  • A. Reverse from reject to ready.
  • B. Reverse the product at the last operation.
  • C. Reverse from scrap to ready.
  • D. Reverse resources charged to a work order.
  • E. Reverse at an operation.
  • F. Reverse material issued to a work order.

Answer: A,C,D,F

 

NEW QUESTION 47
You are setting up Fusion Manufacturing to support Back-to-Back Fulfillment.
Identify an option that needs to be set for oracle Fusion Planning Central to plan back-to-back item components and resources.

  • A. Select the Used in Planning check box in the new Work Definition.
  • B. Select the Used in Planning check box in the Work Definition Names.
  • C. Select the Used in Planning check box in the Work Structure.
  • D. Select the Used in Planning check box in the item definition.

Answer: B

 

NEW QUESTION 48
Identify three requirements fulfilled by nonstandard work orders.

  • A. Prototype
  • B. Rescheduling
  • C. Repair
  • D. Rework

Answer: A,C,D

 

NEW QUESTION 49
The Manufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day and Night Shift.
Identify the correct sequence of steps to achieve this requirement.

  • A. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column
  • B. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
  • C. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
  • D. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column.

Answer: D

 

NEW QUESTION 50
A Work Center created a month ago is no longer in use now. You want to remove the Work Center; however, the system is no allowing you to delete it.
Identify three reasons for this.

  • A. There are resources associated with the Work Center.
  • B. The work center is being referenced in the Work Area.
  • C. The Work Center is being referenced in the Closed Work Order.
  • D. The Work Center is being referenced in the Open Work Order.
  • E. The work center is being references in the work definition operation.

Answer: A,B,D

 

NEW QUESTION 51
You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation.
Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application?

  • A. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
  • B. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order name> Tap or click the Release action, and click OK
  • C. Select the infotile On Hold> Select a work order you want to release> Select the work order operation on hold > Swipe left on the work order name> Tap or click the Release action, and click OK
  • D. Select the infertile Dispatch List> Select a work order operation you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK

Answer: D

 

NEW QUESTION 52
Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

  • A. Version
  • B. State Date
  • C. Production Priority
  • D. Costing Priority

Answer: A,B

 

NEW QUESTION 53
......

Use Real 1z0-1075-20 Dumps - 100% Free 1z0-1075-20 Exam Dumps: https://www.realexamfree.com/1z0-1075-20-real-exam-dumps.html